Gladstone Center for Children & Families
Built in 1970 | Renovated in 2009
Safe, Secure, & Accessible Schools
- Fire and life safety system code update
- New secure entryway
- ADA updates
- New/updated security cameras
- New security alarms and lockdown systems
Fix Failing School Buildings & Preserve Facilities
- Roof restoration
- Plumbing updates
- HVAC system updates
- Updated interior finishes (paint, flooring, signage)
- Restroom updates
- Paving and sidewalk repairs
- Storm system replacement
- Updates to play areas including new solid play surfaces, playground equipment, and ADA updates
John Wetten Elementary
Built in 1969
Safe, Secure, & Accessible Schools
- New fire alarm and life safety systems
- New secure entryway
- ADA updates
- New/updated security cameras
- New security alarms and lockdown systems
Fix Failing School Buildings & Preserve Facilities
- Roof repair and replacement
- Plumbing updates
- HVAC system updates
- Building exterior updates (new siding, paint, brick)
- Electrical system updates
- Updated interior finishes (paint, flooring, signage)
- Restroom updates
- Paving and sidewalk repairs
- Storm system replacement
- Updates to play areas including new solid play surfaces, playground equipment, and ADA updates
Kraxberger Middle School
Built in 1965
Safe, Secure, & Accessible Schools
- New fire alarm and life safety systems
- New secure entryways
- ADA updates
- New/updated security cameras
- New security alarms and lockdown systems
Fix Failing School Buildings & Preserve Facilities
- Roof restoration
- Plumbing updates
- HVAC system updates
- Updated interior finishes (paint, flooring, signage)
- Restroom updates
- Paving and sidewalk repairs
- Storm system replacement
- Updates to play areas including new solid play surfaces, playground equipment, and ADA updates
Gladstone High School
Built in 1965
Safe, Secure, & Accessible Schools
- New fire alarm and life safety systems
- New secure entryways
- New/updated security cameras
- New security alarms and lockdown systems
- ADA updates
Fix Failing School Buildings & Preserve Facilities
- Roof restoration or replacement
- Plumbing updates
- HVAC system updates
- Electrical system updates
- Updated interior finishes (paint, flooring, signage)
- Restroom updates
- Updates to athletic facilities including turf fields, track repairs and field/stadium lighting
- Paving and sidewalk repairs
- Storm system replacement
The Proposed 2026 Gladstone School Bond