Projects at Your School

An overview of proposed bond projects in the district.

Gladstone Center for Children & Families

Built in 1970 | Renovated in 2009 

Safe, Secure, & Accessible Schools

  • Fire and life safety system code update
  • Updated safety features including vestibules, upgraded access, controls, and cameras
  • ADA updates

Fix Failing School Buildings & Preserve Facilities

  • Roof restoration
  • Plumbing updates
  • HVAC system updates
  • New water heater
  • Updated interior finishes (paint, flooring, signage)
  • Restroom updates
  • Paving and sidewalk repairs
  • Updates to play areas including new solid play surfaces, playground equipment, and ADA updates

John Wetten Elementary

Built in 1969

Safe, Secure, & Accessible Schools

  • New fire alarm and life safety systems
  • Updated safety features including vestibules, upgraded access, controls, and cameras
  • ADA updates

Fix Failing School Buildings & Preserve Facilities

  • Roof repair and replacement
  • Plumbing updates
  • HVAC system updates
  • New boiler
  • Building exterior updates (new siding, paint, brick)
  • Electrical system updates
  • Updated interior finishes (paint, flooring, signage)
  • Restroom updates
  • Paving and sidewalk repairs
  • Updates to play areas including new solid play surfaces, playground equipment, and ADA updates

Kraxberger Middle School

Built in 1965

Safe, Secure, & Accessible Schools

  • New fire alarm and life safety systems
  • Updated safety features including vestibules, upgraded access, controls, and cameras
  • ADA updates

Fix Failing School Buildings & Preserve Facilities

  • Roof restoration
  • Plumbing updates
  • HVAC system updates
  • New water heater
  • Electrical system updates
  • Restroom updates
  • Updated interior finishes (paint, flooring, signage)
  • Building exterior updates (new siding, paint, brick)
  • Paving and sidewalk repairs
  • Updates to play areas including new solid play surfaces, playground equipment, and ADA updates

Gladstone High School

Built in 1965

Safe, Secure, & Accessible Schools

  • New fire alarm and life safety systems
  • Updated safety features including vestibules, upgraded access, controls, and cameras
  • ADA updates

Fix Failing School Buildings & Preserve Facilities

  • Roof restoration or replacement
  • Plumbing updates
  • HVAC system updates
  • New boiler
  • Electrical system updates
  • Updated interior finishes (paint, flooring, signage)
  • Restroom updates
  • Updates to play areas and athletic facilities including turf fields, track repairs, field/stadium lighting, gym upgrades and bleachers
  • Paving and sidewalk repairs

The Proposed 2026 Gladstone School Bond