Projects at Your School

An overview of proposed bond projects in the district.

Gladstone Center for Children & Families

Built in 1970 | Renovated in 2009 

Safe, Secure, & Accessible Schools

  • Fire and life safety system code update
  • New secure entryway
  • ADA upgrades
  • New/upgraded security cameras
  • New security alarms and lockdown systems

Fix Failing School Buildings & Preserve Facilities

  • Roof restoration
  • Plumbing updates
  • HVAC system upgrades
  • Updated interior finishes (paint, flooring, signage)
  • Restroom updates
  • Paving and sidewalk repairs
  • Storm system replacement
  • Updates to play areas including new solid play surfaces, playground equipment, and ADA upgrades

John Wetten Elementary

Built in 1969

Safe, Secure, & Accessible Schools

  • New fire alarm and life safety systems
  • New secure entryway
  • ADA upgrades
  • New/upgraded security cameras
  • New security alarms and lockdown systems

Fix Failing School Buildings & Preserve Facilities

  • Roof repair and replacement
  • Plumbing updates
  • HVAC system upgrades
  • Building exterior updates (new siding, paint, brick)
  • Electrical system updates
  • Updated interior finishes (paint, flooring, signage)
  • Restroom updates
  • Paving and sidewalk repairs
  • Storm system replacement
  • Updates to play areas including new solid play surfaces, playground equipment, and ADA upgrades

Kraxberger Middle School

Built in 1965

Safe, Secure, & Accessible Schools

  • New fire alarm and life safety systems
  • New secure entryways
  • ADA upgrades
  • New/upgraded security cameras
  • New security alarms and lockdown systems

Fix Failing School Buildings & Preserve Facilities

  • Roof restoration
  • Plumbing updates
  • HVAC system upgrades
  • Updated interior finishes (paint, flooring, signage)
  • Restroom updates
  • Paving and sidewalk repairs
  • Storm system replacement
  • Updates to play areas including new solid play surfaces, playground equipment, and ADA upgrades

Gladstone High School

Built in 1965

Safe, Secure, & Accessible Schools

  • New fire alarm and life safety systems
  • New secure entryways
  • New/upgraded security cameras
  • New security alarms and lockdown systems
  • ADA upgrades

Fix Failing School Buildings & Preserve Facilities

  • Roof restoration or replacement
  • Plumbing updates
  • HVAC system upgrades
  • Electrical system updates
  • Updated interior finishes (paint, flooring, signage)
  • Restroom updates
  • Updates to athletic facilities including turf fields, track repairs and field/stadium lighting
  • Paving and sidewalk repairs
  • Storm system replacement

The Proposed 2026 Gladstone School Bond